Ensenada grows its infrastructure with investment by Hutchison Ports EIT

Ensenada grows its infrastructure with investment by Hutchison Ports EIT

Warning: foreach() argument must be of type array|object, bool given in /home/mexiconow/public_html/sites/mexiconow/wp-content/themes/mexiconowwpnew/single.php on line 253

Hutchison Ports EIT invested US$ 100 million to increase the infrastructure and equipment for the Port of Ensenada, which would support the entry of large ships with capacity for over 14,000 20 feet containers (TEU), informed Paulina Zermeño, Commercial Manager of the Integral Port Administration (API).

She explains that this investment will be made during the 2017-2037 period, as the partial rights transfer contract Hutchison Ports EIT is holding, was extended to 20 more years to continue operating this Multiple Usage Terminal in the port.

MexicoNow

×